Private power firms urge gradual phase-out of green energy transmission waiver

In a representation to the Centre, the Electric Power Transmission Association (EPTA) urged the government to adopt a more flexible approach to the planned withdrawal of the Inter-State Transmission System (ISTS) waiver.

Leave a Comment

Leave a Reply

Your email address will not be published. Required fields are marked *